sales2@shandongluyuan.com
image
image

Pile cage welding machine LYGH-1250D

1.Product Type: Pile cage welding machine
2.Operation Mode: Fully automatic / PLC control
3.Welding Method: Double-gun automatic spot welding
4.Rebar Diameter Range: Main bar φ16–40 mm, spiral bar φ6–12 mm
5.Cage Diameter Range: 350–1250 mm
6.Cage Length Range: Standard 12 m (customizable)
7.Power Supply: 380V / 50Hz / 3-phase
8.Control System: PLC + touch screen interface
9.Production Efficiency: 8 sections/10h
10.Main Materials: High-strength steel frame structure
11.Application: Pile foundation, housing construction, small & medium engineering

Product Description

Pile Cage Welding Machine LYGH-1250D – High-Efficiency Automated Steel Cage Fabrication

Shandong Zhongji Luyuan Machinery Co., Ltd., established in 2016 with a registered capital of RMB 50 million, presents the Pile cage welding machine LYGH-1250D—a fully automated CNC solution designed for large-scale foundation engineering. This industrial-grade equipment handles cage diameters from 350 to 1250 mm and main bar diameters of φ16–40 mm, delivering remarkable precision in pile foundation fabrication. With a production capacity of 8 sections per 10-hour shift and requiring only 2 operators, the LYGH-1250D dramatically reduces labor costs while maintaining consistent weld quality. The top-mounted double-gun automatic welding system ensures stable, straight welding spots across every cage section, meeting the rigorous demands of high-speed rail, subway tunneling, and bridge pier construction projects worldwide.

Why Choose Our Automated Pile Cage Solution

Modern framework ventures request speed, accuracy, and unwavering quality. You're confronting tight due dates, rising labor costs, and strict quality standards.

Our machine addresses these challenges head-on. The PLC touch screen control framework rearranges operation, permitting your group to ace the gear rapidly. The more extensive 1250 mm distance across capacity implies you can handle differing extend details without contributing in numerous machines.

Top-mounted welding innovation disposes of common arrangement issues. Your cages will meet dimensional resiliences reliably, lessening revamp and fabric squander. The programmed welding handle keeps up uniform warm dispersion, guaranteeing each weld point accomplishes the required shear strength.

With hardware traversing 28 m × 8 m, you get industrial-scale yield in a reasonable impression. The 60 KW add up to control (counting 30 KW welding control) conveys vigorous execution whereas keeping up sensible vitality utilization for persistent operation.

Technical Specifications

Parameter Value
Model LYGH-1250D
Cage Diameter Range φ350–φ1250 mm
Standard Cage Length 12 m (Customizable beyond 12m)
Main Bar Diameter φ16–φ40 mm (Customizable)
Spiral Bar Diameter φ6–φ12 mm (Customizable)
Spiral Bar Spacing ≤300 mm
Hydraulic Pressure ≤16 MPa
Air Supply Pressure ≤0.8 MPa
Welding System Top-mounted double gun automatic
Total Equipment Power 60 KW (Welding: 30 KW)
Power Supply 380V / 50Hz / 3-phase
Control System PLC + Touch Screen Interface
Operating Personnel 2 persons
Production Efficiency 8 sections / 10 hours (12m/section)
Footprint 28 m × 8 m

Core Advantages That Drive Your Productivity

Top-Mounted Welding Precision

The elevated double-gun system provides superior visibility and access. Your operators can monitor weld quality in real-time, ensuring every joint meets structural requirements.

Maximum Diameter Versatility

The 1250 mm capacity handles everything from standard piles to oversized foundation requirements. You're equipped for housing construction, medium-scale projects, and demanding pile foundation applications without equipment limitations.

True Labor Efficiency

Reduce your crew from 4-6 manual welders to just 1 operator. The automated feeding and rotation systems handle material positioning while the PLC manages welding sequences. Your team focuses on supervision rather than repetitive manual tasks.

Consistent Cage Geometry

Automated rotation and spacing control eliminate the dimensional variations common in manual fabrication. Your cages will pass inspection the first time, keeping projects on schedule.

High-Speed Production Capacity

Producing 8 twelve-meter cages in a standard 10-hour shift means you can fulfill large orders without overtime expenses. The hydraulic system maintains consistent pressure throughout extended production runs.

Pile cage welding machine LYGH-1250D

Real-World Engineering Applications

High-Speed Railway Bridge Piers

Mass-produce foundation piles where fatigue resistance matters most. The machine's precision spacing and weld strength meet the rigorous standards required for high-vibration railway infrastructure.

Urban Subway Construction

Tight urban sites demand maximum output in minimal space. The Pile cage welding machine LYGH-1250D delivers high-volume production for diaphragm walls and foundation piles, helping you meet aggressive tunneling deadlines.

Marine and Coastal Projects

Fabricate corrosion-resistant cages for wharf foundations and sea-crossing bridges. The stable welding process ensures structural longevity in harsh salt-spray environments where weld integrity directly impacts lifespan.

Your construction timeline depends on reliable equipment. This machine performs consistently in confined sites and challenging conditions.

Pile cage welding machine LYGH-1250D

Quality Standards You Can Verify

Every unit undergoes comprehensive factory testing before shipment. Weld point shear strength tests verify joints exceed 1.5 times wire strength—the industry benchmark for structural safety.

Longitudinal rib spacing uniformity checks ensure your cages meet engineering drawings precisely. We test rotating disk eccentricity to guarantee cage roundness within specified tolerances.

PLC error-correction logic undergoes emergency stop testing. The pneumatic welding head response speed is measured to confirm consistent performance under production pressure. Transformer temperature rise monitoring ensures electrical system reliability during continuous operation.

These inspection protocols align with international civil engineering standards for reinforced concrete structures, giving you documentation for project compliance.

Pile cage welding machine LYGH-1250D

Proven Partnership Track Record

Shandong Zhongji Luyuan serves China's top construction enterprises including China Railway Group, CRCC, CSCEC, CCCC, and CNECC. Our equipment supports projects across nearly 100 countries, from Kazakhstan infrastructure to South African mining operations.

This global presence reflects equipment reliability and service capability. You're partnering with a manufacturer backed by RMB 50 million in registered capital and dedicated after-sales support networks.

Our expertise spans nuclear power, hydropower, underground utility corridors, and high-speed rail—the most demanding applications in civil engineering. If our equipment meets these standards, it will exceed expectations in your projects.

Frequently Asked Questions

Q: What diameter range does the LYGH-1250D actually process?

A: The machine handles cage diameters from 350 mm to 1250 mm. Main bars range from φ16 to φ40 mm, while spiral bars accommodate φ6 to φ12 mm. Custom specifications are available for specialized applications.

Q: How many operators do I need for full production?

A: You need 2 personnel—one operator managing the PLC system and one handling material feeding. This is dramatically fewer than the 4-6 workers required for manual welding of equivalent output.

Q: Can the machine produce cages longer than 12 meters?

A: Yes, the standard 12-meter length is customizable. Contact our engineering team to discuss your specific length requirements and site constraints for longer cage fabrication.

Q: What's the actual welding quality compared to manual methods?

A: Automated welding provides superior consistency. Every weld point receives identical heat and pressure, eliminating the variations inherent in manual welding. Weld strength tests consistently exceed manual benchmarks.

Q: How long does installation and training take?

A: Typical installation requires 3-5 days including mechanical setup, electrical connections, and hydraulic system commissioning. Operator training takes 2-3 days to achieve production proficiency with our technical team's guidance.

Q: What maintenance schedule should I follow?

A: Daily checks include hydraulic oil levels, air pressure, and welding gun alignment. Weekly maintenance covers lubrication points and PLC system verification. Monthly inspections address electrical connections and structural components.

Pile cage welding machine LYGH-1250D

Get Your Production Solution Today

Ready to transform your pile cage fabrication process? Our team understands the pressures of large-scale construction schedules and budget constraints.

Contact us at sales2@shandongluyuan.com to discuss your specific Pile cage welding machine LYGH-1250D requirements. We'll provide detailed specifications, performance data, and ROI calculations tailored to your operation.